|
Equipment for processing water, which will be produced from wells drilled on Test Site #1 for that purpose.
|
In the foreground, the stack that will sit on top of the generator; it's about 20 ft tall (6 m).
|
Radiant section (top left) of steam generator is about 60 ft long (18 m).
|
|
Meet our summer students, shown here with some of our personnel on July 10. The students rotate through a variety of diverse jobs in operations areas. Left to right: Robert St. Pierre (Community Liaison, Oilsands Quest), Murray Wilson (Executive Chairman), Charity Sylvestre, Timmy Lemaigre, Chris Hopkins (President & CEO), Simon Raven (Chief Geologist), Geneva Moise, Jarret Laliberte, Farrah Lemaigre, Morris Kimball (Site Supervisor), Dawn Herman and Randy Janvier (Community Liaison, Oilsands Quest). |